Alida Engineering

The Department of Forestry Engineering and Environment of ALIDA ENVIRONMENTAL ENGINEERING S.L. performs environmental consulting works, developing projects, surveys, studies, reports, etc., in terms of management, protection and restoration of the Natural Environment.

Services

After many years of experience, we are experts in:

R

Environmental assessment

R

Rivers and wetlands restoration

R

Environmental integration of civil works

R

Adaptation to climate change and carbon fixation

R

Surveys and expert assessment on woodland and damage to elements

R

Certification of energy efficiency in building

R

R & D in renewable energy, and climate change mitigation and adaptation

Level of customer satisfaction

  • Assessment 98%
  • Restoration 87%
  • Integration 91%
  • Adaptation 81%
  • Survey and valuation 88%
  • Certification 94%
  • R & D 88%

Projects

These are some of the projects we have done in these 20 years:

 

Rivers and wetlands – Water Planning

  • July 2015 (Guadiana Hydrographic Confederation, through AMBISAT Ingeniería Ambiental, S.L.): Review of the Guadiana River Basin Management  Plan (2016-2021):
    • Update of the Water Resources Inventory
    • Restoration measures for the Tablas de Daimiel National Park surroundings.
    • Management measures for the Natura 2000 Network.
    • Cost – Effectiveness Analysis of the measures.
Scheme for the restoration of banks in the environment of Tablas de Daimiel National Park

Scheme for the restoration of banks in the environment of Tablas de Daimiel National Park

  • February 2015 (URA- Basque Water Agency, through AMBISAT Ingeniería Ambiental, S.L.): River restoration Master Plan for Basque Country.
  • September 2001 (Ministry of Environment, trhough TRAGSATEC, Tecnologías y Servicios Agrarios, S.A.): Strategic Environmental Assessment of the National Hydrological Plan.
    • Report on Aquatic Fauna Filtration in large flow channels.
    • Report on Considerations in the design of canals and reservoirs for water self-purification.
    • Report on General measures of environmental integration to be considered in the water transfer works of the National Hydrological Plan.

 

Rivers and wetlands – Restoration

  • June 2014 (United Nations Development Program, through AMBISAT Ingeniería Ambiental, S.L.): Feasibility Study and Conceptual Design for Wetland Restoration within the ‘Ezerani’ Nature Park (Prespa Lake Basin).
  • May 2011 (Tajo Hydrographic Confederation, through AMBISAT Ingeniería Ambiental, S.L.): Project decommissioning reservoir, called Robledo de Chavela, on the Cofio River (Madrid).
  • March 2008 (Tajo Hydrographic Confederation, through AMBISAT Ingeniería Ambiental, S.L.): Adequacy Project of the Henares River on its way through Alcalá de Henares (Madrid).
  • April 2010 (Tajo Hydrographic Confederation, through AMBISAT Ingeniería Ambiental, S.L.): Rehabilitation project of the Board of Tajo and Jarama Rivers in Aranjuez (Madrid and Toledo).
  • July 2009 (Tajo Hydrographic Confederation, through AMBISAT Ingeniería Ambiental, S.L.): Fish permeation project for the protection dam of the viaduct of the N502 highway over the Tiétar River.
Fish ladder over an obstacle to open up the river to migration again

Fish ladder over an obstacle to open up the river to migration again

 

Environmental integration of civil Works

  • October 2012 (Farmavenix – Grupo COFARES, S.A.): Slope Stabilization and landscape integration measures for Farmavenix Company in Marchamalo Industrial Estate (Guadalajara).
Slopes in Farmavenix

Slopes in Farmavenix

  • April 2009 (ADIF, through TRN Ingeniería y Planificación de Infraestructuras, S.A.): Environmental Integration of the construction project of the platform for the high speed Corridor North-Northwest. Section: Valladolid-Burgos. Subsection: Villazopeque-Estépar.
  • April 2007 (ADIF, through TRN Ingeniería y Planificación de Infraestructuras, S.A.): Environmental Integration Annex for the construction project of the New Railway Complex de la new Railroad Arterial Network (RAF) in Valladolid.
  • December 2006 (ADIF, through TRN Ingeniería y Planificación de Infraestructuras, S.A.): Environmental Integration Annex of the construction project of the section for the access to Albacete of the new high speed railroad Levante access. Madrid – Castilla la Mancha – Valencia –Murcia.
  • September 2004 (GIF, through UTE: TRN Ingeniería S.A. – GTT Ingeniería SA– Intercontrol SA – Bureau Veritas SA.): Environmental Integration Measures Project of the Platform of the section Caudete – Villena of the high speed line “Madrid – Castilla La Mancha – Valencia – Murcia”.

 

Works of protection, management and restoration of natural environment

  • December 2013 (Ministry of Industry, Energy and Tourism): Study on the Cycling and Mountain Biking Product in the “Sierra de Guadarrama National Park”.
  • November 2008 (General Directorate of Natural Environment and Forest Policy of the Ministry of Environment, through AMBISAT Ingeniería Ambiental SL): Technical Specification (Terms of References) for project drafting and for the execution of works for the Forest Restoration Plan called “45 Millions of trees”.
  • October 2004 (AENA, Spanish airport and air navigation authority.): Project for corporate gift supply through sustainable harvesting of pine forests of the Madrid – Barajas Airport.
Pine nuts pastries made from pine grove of Madrid-Barajas Airport

Pine nuts pastries made from pine grove of Madrid-Barajas Airport

  • July 2000 (Agriculture Regional Government of Castilla y León, through TRAGSATEC, Tecnologías y Servicios Agrarios, S.A.): Lagunas de Villafáfila, Protective, corrective and compensatory measures project and Environmental monitoring program of the Environmental Impact Study for the watering irrigation area called “Tierra de Campos”, 2nd Phase (Zamora).
  • January 2000 (Ministry of Public Works, through TRAGSATEC, Tecnologías y Servicios Agrarios S.A.): Technical assistance to the Project for Environmental Restoration and Littoral Edge conditioning of the Portmán Bay, Murcia.

 

Environmental assessment

  • July 2015 (Guadiana Hydrographic Confederation, through AMBISAT Ingeniería Ambiental, S.L.): Strategic Environmental Assessment of the review of the Guadiana River Basin Management Plan (2016-2021).
  • July 2013 (Tajo Hydrographic Confederation, through AMBISAT Ingeniería Ambiental S. L.). Environmental Impact Study of the Project for the Integration of the Tajo River into Toledo city. Toledo (Castilla – La Mancha).
Studio of visual effects of the project of integration of the Tagus River in Toledo

Studio of visual effects of the project of integration of the Tagus River in Toledo

  • June 2004 (GIF, Ministry of Public Works, through UTE: TRN Ingeniería y Planificación de Infraestructuras – COTAS.): Environmental Impact Study of the railroad high speed line “A Coruña – Ferrol”.
  • July 2001 (Ministry of Environment, Teide National Park, through TRAGSATEC, Tecnologías y Servicios Agrarios, S.A.): Environmental Impacts Study of the facilities, use, dismantling and subsequent alternatives of the “Pico del Teide” cableway.
  • July 1999 (Guadalquivir Hidrographic Confederation, Ministry of Environment, through TRAGSATEC, Tecnologías y Servicios Agrarios S.A.): Environmental Impact Study of the Restoration Project of Soto Grande and Soto Chico Streams and the stream of the Reyes Lagoon, in the Almonte municipality, Huelva. Project “Doñana 2005”, Action nº1.

Give us a call or send us an email!

Consult us anything you need or transmit any questions or suggestions you have!

We always respond within 72 hours.

Contact us